Skip to main content

For Designers Only

For Designers Only
Florida / Custom Drapery Fabrication

Custom Drapery Fabrication for Interior Designers

In-house drapery fabrication in Vero Beach for the design trade. Bring your fabric selections, treatment schedule, and available drawings so we can review construction details and identify what still needs to be resolved.

Before fabrication

Define the details before production.

A useful drapery package connects each opening to its treatment, fabric, dimensions, and hardware. Label preliminary information clearly and identify decisions awaiting confirmation. For treatment options, see custom drapery; for an organized starting point, use the project handoff checklist.

01

Opening references

Label each room and opening so plans, photographs, and treatment schedules refer to the same location.

02

Fabric and trim

For designer-supplied fabric, share the selection, width, repeat, available yardage, and intended treatment. Include lining, interlining, and trim preferences where known.

03

Dimensions and hardware

Identify preliminary versus confirmed measurements, mounting conditions, and proposed hardware. Include return, stack, and clearance details where available.

04

Outstanding decisions

Note anything awaiting selection or confirmation, and who will approve it. Identify who is responsible for final site measurements and installation.

Custom fabrication

From specification review to finishing.

From specification review through finishing, our team keeps custom drapery under direct workroom oversight. Our team brings more than 45 years of combined experience, including one team member with more than 30 years of experience. Pattern matching and finishing are reviewed against the approved project direction, with measures, approvals, and installation timing coordinated around the project scope.

01

Pattern and proportion

Scale, repeat, seam placement, fullness, and heading choices are reviewed against the room and fabric.
02

Material decisions

Lining, interlining, blackout needs, sheers, trims, and hardware compatibility are coordinated before production.
03

Production sequencing

Measures, approvals, fabrication, delivery, and installation timing are coordinated around the construction schedule and approved scope.

04

Final quality review

Pattern placement, finishing, and approved details are reviewed before completed treatments leave the workroom.